PO + seal
Signed commercial terms, PPS, bill of materials and delivery window.

Sourcing & economics / 03
A supplier, cost and production framework that makes quality and margin visible before Goldridge commits cash to inventory.
Visual evidence / 03
Desire · proof · execution


Standard supplier RFQ
Every supplier receives the same tech pack, quantity scenario, quality standard and commercial question set. Incomplete quotes are not treated as lower prices.
01Sample fee and refund condition
02MOQ by style / colour / size
03Material and component availability
04EXW / FOB unit price by quantity tier
05Branding and packaging cost
06Proto, SMS, PPS and bulk lead times
07Payment terms and deposit exposure
08Certificates and test capacity
09Quality-control process and AQL proposal
10Freight mode, origin and HS-code support
11Reorder capability and minimum repeat
12Capacity reservation and delay remedy
True cost equation
The buying price is not the landed cost. Every scenario must also reserve for testing, payment currency, defects and late-delivery impact.
Open pricing and margin guardrails →Supplier scorecard
25%Product quality and outerwear competence
20%Cost at realistic landed basis
15%MOQ and reorder flexibility
15%Lead-time reliability and capacity
10%Evidence, compliance and traceability
10%Communication and change control
5%Payment terms and currency risk
Decision table / populated after RFQ
The site defines the comparison structure; names, costs and ratings remain blank until documented quotations are received.
Candidate ATo verifyRFQPendingPendingPendingOpen
Candidate BTo verifyRFQPendingPendingPendingOpen
Candidate CTo verifyRFQPendingPendingPendingOpen
Production control
Signed commercial terms, PPS, bill of materials and delivery window.
Lab dips, bulk fabric, insulation and trims checked before cutting.
Construction, measurement and placement review during production.
Sampling plan, defect classification, carton and quantity verification.
Documents, insurance, duty, milestones and exception owner.
Warehouse count, quarantine process and saleable-stock release.
Commercial safeguards
Do not pay bulk deposit before PPS, cost and demand gates are green.
Separate core component commitments from speculative seasonal colour.
Agree acceptable substitutes, tolerance and approval authority before shortage.
Model a delay, defect and currency scenario—not only the perfect case.
Secure repeat capability for NOOS before claiming permanent availability.